+86 18363983226 Welcome to Qingdao Huangang Heavy Industries Technology Co. , Ltd.
Case

When the shipment is in progress | Huangang Heavy Industry Putty Powder Equipment is being sent to Jingyang for clearance!

Release Date : 2023-11-04View : 882times


Sunny, scorching summer days. A truck loaded with the putty powder production line from the Huangang factory area rushed to the customer site in Jingyang to help increase production and efficiency of the putty powder project.

The putty powder production line produced by Huangang is completed with the cooperation of the production department, quality inspection department, and logistics department before loading. Senior assembly workers operate it proficiently, lifting, loading, and fixing in one go, ensuring that each equipment arrives at the customer's project site in a timely and intact manner.

Here at Huangang, it should be mentioned that the bearings of the mixer do not need to be replaced regularly. The traditional process is to directly install the bearings after welding, which requires frequent replacement. In response to the above issues, after the mixer is welded, it is processed at a large machining center to ensure the same axis and parallelism of the bearings. This can improve the service life of the bearings, improve sealing, and achieve high-speed operation.


Copyright 2023 All rights reserved.